2500 square foot, 100,000 gallon outdoor pool and tennis complex on Cedar Drive was completed by the developer in 1971.
The Association has added heat in 1999 to temper the cold well water and lengthen the season slightly.
The all-purpose Community Center, heated indoor pool and tennis complex located at the corner of Clearview Drive
and Glade Drive was completed by the developer in 1975 and cosmetic renovations at the Community Center are ongoing in 2004.
During the summer months we have lifeguard-staffed swimming beaches and bathhouse facilities at Main Beach on East Emerald Lake
and Pinetree Island Park. Each of these locations also have picnic areas and some playground equipment.
A full court basket ball facility was build near the Administration Building on Glade Drive in 1998.
As the need arises additional facilities are planned for the old ski slope area which terminates at a future beach/marina
site on Mountaintop Lake.